A crack has opened into a trench, or a section has sunk where water sat after one of Dalton's heavy rains. You're trying to decide whether to patch it, resurface it, or tear it out. North Star Asphalt Paving Co. can help you sort that out. Call with the rough size of the driveway and what you're seeing (a photo helps but isn't required).
What actually shortens the life of an asphalt driveway here?
Water does most of the damage. Dalton gets around 50 inches of rain in a typical year, and the occasional heavy downpour tests every low spot and bad slope you have. Asphalt is flexible, which helps on a firm base and hurts on a soft one. If water gets under the edges or down through cracks, the base loses support and the pavement flexes more than it should. That's how a hairline crack becomes a sunken, broken patch.
The second cause is how the asphalt went down. Hot mix arrives by truck and gets spread to the right width and thickness with a paver and screed. Rolling has to start promptly, with breakdown, intermediate and finish passes, because that's what builds density and a smooth surface. Mix that was rolled late or spread thin usually holds together for a season, then starts breaking up. A driveway that never sheds water won't last either, however well it was rolled.
The service behind this guide: asphalt driveway installation. Need asphalt paving in Dalton? Our main page lists everything.
Should you resurface it or replace it?
Resurface if the base is still firm and water runs off the driveway. An overlay over an existing driveway in good condition runs $2.50 to $6.50 per square foot. Where the old surface has to come down first, we use an asphalt milling machine. Replace it if the base itself has failed. That means the ground under the driveway has softened or moved, and the cracking has spread across most of the surface. Replacement, including demolition and removal, runs $7 to $13.50 per square foot.
Size is the biggest thing that moves your number within those ranges. How much base has to be rebuilt and whether the grading needs to change move it too. Look at the pattern of damage. A few isolated cracks or one sunken spot usually point to a repair. Patching the same spots every year or two means the base under them is already gone, so a rebuild is the better spend than another patch. And if water stands on the driveway after rain, we fix the grading before paving anything new, or the new surface will fail the way the old one did.

When should the paving be scheduled?
Schedule it for a dry stretch of weather, not a particular month. A repair needs the area cleaned and dry before we tack it and place the mix, and hot mix has to be compacted promptly after it's placed. Rain in the forecast can ruin either step, so we'd rather move the date than pave into it.
Don't wait for a perfect forecast if the driveway is getting worse. Standing water on a failed section keeps softening the base underneath it, so the repair gets bigger the longer it sits. If the damage is only cosmetic, you have time to plan and budget.
What does a full replacement involve, and is a permit needed?
A replacement starts with demolition and hauling away the old driveway. Then we regrade if needed so water moves off the pavement and away from the house, and rebuild the base before any hot mix goes down. The paving and rolling follow the sequence described above.
On your own property, that's the whole job. If the work involves excavation in a public street, sidewalk or alley, Dalton city code requires a written permit application first, so we'd start that before anyone digs. Driveway pavement in the street right-of-way also has to use graded aggregate base under plant-mix asphalt. We build to that spec and include the permit step in the schedule we give you.
What happens when you call?
You'll talk to someone from our crew, not a call center. We'll ask roughly how big the driveway is and what problem you're seeing. We'll also ask whether it drains toward the street or toward the house, whether it's been patched before, and about how old the paving is. Nothing is charged for the call, and materials, thickness and repair type get settled later, after we've seen the driveway.
Next comes a site visit, where we check how firm the base is, where the water goes and how far the damage runs. The written quote lists the exact price along with the repair we recommend. If your driveway doesn't need replacing yet, we'll say so. If a patch will hold while you save for a bigger job, we'll say that too.
Pieces of the Work
On a typical job, a few parts of the job:
- For a permanent patch, remove failed material to stable support, square the edges, clean and dry the area, tack the patch surfaces, and place and compact asphalt mix in lifts.